
OUR PROJECTS
500+ projects delivered across the UAE and beyond — spanning fit-out, MEP, HVAC, electrical, civil works, fire protection, and specialist heavy lifting. Every project reflects our commitment to quality, safety, and on-time delivery.
“ From design coordination to final handover — SAKA Group delivers. Tell us about your project and our team will respond within 24 hours. ”
…..
Featured Projects
- Project: Landmark Building Work Detail: MEP, Civil and Fitout works Level 22, 23, 24 Project :
- Saipem full fitout works Work Detail: Full Fitout and Civil works Level 20 Project:
- Project: Aramco Work Detail: Full Fitout works
- Project : Adnoc HQ Food Court Area Work Detail: Full MEP and fitout works 17th Floor
- Project: Adnoc HQ 75th Floor Work Detail: Supply Installation of HVAC and Ventilation System
- Project: Café Del Mar Work Detail: Full Fitout works
- Project: ADNOC SKEC Work Detail: All Facilities renovation
- Project: Main Villa Work Detail: 1241101 – SIN-PROJ-0019.02 – CHW Piping Upgrade – Phase ,Location: Qasr Al Bahr, Abu Dhabi
- Project: Emirates Palace Hotel Work Detail: Replacement of Insulation for CHW Pipe (8 inches) Location: Emirates Palace Mandarin Oriental, Corniche Road, Abu Dhabi
- Project: Aramex Warehouse Work Detail: Installation of 12 Package Units Location: Abu Dhabi Industrial City, Musaffah M-25
- Project: Hilton Hotel / Radisson Blu Work Detail: Installation of Heating and Cooling Pump
- Project: Al Shirawi U.S. Chillers LLC Work Detail: Installation of Heat Cool Pump
- Project: Abu Dhabi Media Work Detail: Replacement and New Installation of FAHUs, AHUs, Package Units, and Split Units
- Project: Al Ain Airport, Al Ain Work Detail: Replacement of Chillers, Transformer, and Switchgear
Project Gallery

Major Projects
Below is the list of some of the major projects executed by SAKA:





































